I-85R NB TO SR 166 over I-75- 2 I-75 RAMPS

IN SOUTH ATLANTA · County 121, Georgia · Built 1988 · 2 Lanes · 6,805 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012106390
Year Built
1988
Length
167.6 m (549.9 ft)
Max Span
70.7 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
6,805
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.