I-85 over SOUTH RIVER

IN S ATLANTA · County 121, Georgia · Built 1986 · 6 Lanes · 205,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000012106330
Year Built
1986
Length
14.9 m (48.9 ft)
Max Span
3 m
Width
33.2 m (108.9 ft)
Lanes
6
Daily Traffic
205,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.