US 29 SR 14 MAIN over M-9064 NORMAN BERRY RD
IN EAST POINT · County 121, Georgia · Built 1962 · 5 Lanes · 9,340 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.684594, -84.440433
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 64 years old.
Nearby Bridges
HAROLD SHEAT PKY. over SR 14-M-9116-MARTA-CSX R
Built 1985
IRENE KIDD PARKWAY over CEN OF GA RAILROAD
Built 1986
IRENE KIDD PARKWAY over CSX RAILROAD
Built 1986
IRENE KIDD PARKWAY over MARTA
Built 1986
SR 154 NBL over M-9072 STANTON ROAD
Built 1965
SR 154 SBL over M-9072 STANTON ROAD
Built 1965
US 29 / SR. 14 over SR 166
Built 1983
ALISON STREET over SOUTH UTOY CREEK TRIB
Built 1966
STANTON ROAD over SOUTH UTOY CREEK
Built 1964
MURPHY AVE. over CS 1191 ASTOR AVE.
Built 1983
Bridge Details
- Structure #
- 000000012100450
- Year Built
- 1962
- Reconstructed
- 1985
- Length
- 26.2 m (86 ft)
- Max Span
- 13.1 m
- Width
- 27.3 m (89.6 ft)
- Lanes
- 5
- Daily Traffic
- 9,340
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $611,000
- Total Project Cost
- $916,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.