SR 154 NBL over M-9072 STANTON ROAD
IN NORTH EAST POINT · County 121, Georgia · Built 1965 · 2 Lanes · 45,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.698014, -84.448456
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 61 years old.
Nearby Bridges
SR 154 SBL over M-9072 STANTON ROAD
Built 1965
ALISON STREET over SOUTH UTOY CREEK TRIB
Built 1966
STANTON ROAD over SOUTH UTOY CREEK
Built 1964
SR 154 SBL over M-9071 DELOWE DRIVE
Built 1965
SR 154 / SR 166 NB over M-9071 DELOWE DRIVE
Built 1965
DELOWE DRIVE over SOUTH UTOY CREEK TRIB
Built 1970
HAROLD SHEAT PKY. over SR 14-M-9116-MARTA-CSX R
Built 1985
US 29 SR 14 MAIN over M-9064 NORMAN BERRY RD
Built 1962
SR 154 over SOUTH UTOY CREEK
Built 1964
US 29 / SR. 14 over SR 166
Built 1983
Bridge Details
- Structure #
- 000000012100990
- Year Built
- 1965
- Length
- 54.3 m (178.1 ft)
- Max Span
- 19.5 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 45,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $507,000
- Total Project Cost
- $740,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.