SR 154 SBL over M-9072 STANTON ROAD

IN NORTH EAST POINT · County 121, Georgia · Built 1965 · 2 Lanes · 10,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012101000
Year Built
1965
Length
53.6 m (175.9 ft)
Max Span
19.5 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
10,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$607,000
Total Project Cost
$838,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.