IRENE KIDD PARKWAY over CSX RAILROAD
IN EAST POINT CITY LIMITS · County 121, Georgia · Built 1986 · 4 Lanes · 11,400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.676117, -84.438858
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 40 years old.
Nearby Bridges
IRENE KIDD PARKWAY over CEN OF GA RAILROAD
Built 1986
IRENE KIDD PARKWAY over MARTA
Built 1986
US 29 SR 14 MAIN over M-9064 NORMAN BERRY RD
Built 1962
CENTRAL AVE. over M-9064 NORMAN BERRY DR
Built 1978
HAROLD SHEAT PKY. over SR 14-M-9116-MARTA-CSX R
Built 1985
I-85 SPUR AIR. CON over I-85
Built 1963
NORMAN BERRY DR over I-85
Built 1963
BOBBY BROWN PKWY over I-85
Built 1991
E. MAIN STREET over M-9095 VIRGINIA AVE.
Built 1986
US 29/ SR 14 over M-9095 VIRGINIA AVE.
Built 1986
Bridge Details
- Structure #
- 000000012151840
- Year Built
- 1986
- Length
- 9.8 m (32.2 ft)
- Max Span
- 9.8 m
- Width
- 25.9 m (85 ft)
- Lanes
- 4
- Daily Traffic
- 11,400
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $193,000
- Total Project Cost
- $290,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.