I-675 SBL over CR 142 HENRICO ROAD

6 MI S OF DECATUR · County 089, Georgia · Built 1984 · 4 Lanes · 82,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008902890
Year Built
1984
Length
68 m (223.1 ft)
Max Span
27.1 m
Width
23.5 m (77.1 ft)
Lanes
4
Daily Traffic
82,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,347,000
Total Project Cost
$2,020,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.