I-285 RMP TO I20 E over I-285 (SR 407)

5.8 MI SE OF DECATUR · County 089, Georgia · Built 1982 · 2 Lanes · 6,805 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008902600
Year Built
1982
Length
80.5 m (264.1 ft)
Max Span
25.3 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
6,805
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,032,000
Total Project Cost
$1,547,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.