I-285 over I-20 RAMP

5.8 MI SE OF DECATUR · County 089, Georgia · Built 1983 · 6 Lanes · 144,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008902580
Year Built
1983
Length
25.6 m (84 ft)
Max Span
25.6 m
Width
37.1 m (121.7 ft)
Lanes
6
Daily Traffic
144,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$686,000
Total Project Cost
$1,029,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.