I-285 RAMP over I-20 RAMP

I-285 & I-20 INT. · County 089, Georgia · Built 1985 · 3 Lanes · 23,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008902590
Year Built
1985
Length
23.2 m (76.1 ft)
Max Span
23.2 m
Width
28.5 m (93.5 ft)
Lanes
3
Daily Traffic
23,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$378,000
Total Project Cost
$567,000