I-285 CBL RAMP over I-20

INTERSECTION I-20 & I-285 · County 089, Georgia · Built 1965 · 3 Lanes · 6,805 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008900970
Year Built
1965
Reconstructed
2004
Length
71.3 m (233.9 ft)
Max Span
23.8 m
Width
31.7 m (104 ft)
Lanes
3
Daily Traffic
6,805
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,164,000
Total Project Cost
$1,745,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.