RAINBOW DRIVE over I-285- I-20 RAMP

8.2 MI SE OF DECATUR · County 089, Georgia · Built 1967 · 2 Lanes · 11,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008901610
Year Built
1967
Reconstructed
1982
Length
102.1 m (335 ft)
Max Span
27.4 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
11,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,309,000
Total Project Cost
$1,963,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.