CHAMBLEE-TUCKER RD over I-285 RAMP (SR 407)

2 MI SE OF DORAVILLE · County 089, Georgia · Built 1980 · 6 Lanes · 25,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008902000
Year Built
1980
Length
23.8 m (78.1 ft)
Max Span
23.8 m
Width
28.8 m (94.5 ft)
Lanes
6
Daily Traffic
25,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$637,000
Total Project Cost
$956,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.