CHAMBLEE-TUCKER RD over I-285 (SR 407)
2 MI S OF DORAVILLE · County 089, Georgia · Built 1981 · 6 Lanes · 25,200 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.885608, -84.251758
This bridge is in worse condition than 34.9% of bridges in County 089. The average bridge in Georgia is 0 years old; this one is 45 years old.
Nearby Bridges
CHAMBLEE-TUCKER RD over I-285 RAMP (SR 407)
Built 1980
PRES. PARKWAY over N FORK PEACHTREE CREEK
Built 1967
I-285 over M-9276 HENDERSON MILL RD
Built 1968
PRESIDENTIAL DRIVE over N FORK PEACHTREE CREEK
Built 1967
I-85 NB OFF RAMP over SR407(US 23RMP TO M9265)
Built 1985
RMP I-85N TO I-285 over I-85- I-285- 4 RAMPS
Built 1985
I-85 SBL OFF RAMPS over I-85- I-285- 2 RAMPS
Built 1987
I-85 NBL OFF RAMP over I-285 RMP CB TO I-85 NB
Built 1985
I-285 CCBL OFF RMP over 2 I-85 RMPS- 1 I-285 RMP
Built 1986
I-285 over I-85- I-85 RAMP
Built 1968
Bridge Details
- Structure #
- 000000008901990
- Year Built
- 1981
- Length
- 70.1 m (230 ft)
- Max Span
- 41.8 m
- Width
- 28.8 m (94.5 ft)
- Lanes
- 6
- Daily Traffic
- 25,200
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,879,000
- Total Project Cost
- $2,819,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.