CHAMBLEE-TUCKER RD over I-85

1.7 MI S OF DORAVILLE · County 089, Georgia · Built 1974 · 6 Lanes · 29,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000008901970
Year Built
1974
Length
64.6 m (211.9 ft)
Max Span
33.8 m
Width
28.2 m (92.5 ft)
Lanes
6
Daily Traffic
29,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,732,000
Total Project Cost
$2,598,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.