AMBOY ROAD over LIME CREEK

2 MILES EAST OF ARABI · County 081, Georgia · Built 2010 · 2 Lanes · 350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008150590
Year Built
2010
Length
38.1 m (125 ft)
Max Span
13.7 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
350
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$488,000
Total Project Cost
$733,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.