BROCK ROAD over REEDY CREEK
1.1 MI S OF JCT SR 90 · County 081, Georgia · Built 2020 · 2 Lanes · 130 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
31.856061, -83.661247
This bridge is in worse condition than 33% of bridges in County 081. The average bridge in Georgia is 0 years old; this one is 6 years old.
Nearby Bridges
HAWPOND ROAD over REEDY CREEK
Built 2009
SR 90 over DEEP CREEK
Built 1985
HAWPOND ROAD over DEEP CREEK
Built 2008
WATSON ROAD over REEDY BRANCH
Built 2006
WATSON ROAD over REEDY BRANCH TRIB.
Built 1950
HAWPOND ROAD over LIME CREEK
Built 1999
BEDGOOD ROAD over LIME CREEK
Built 1972
AMBOY ROAD over LIME CREEK
Built 2010
BEDGOOD ROAD over I-75
Built 1960
HAW POND ROAD over PATES BRANCH TRIB
Built 1962
Bridge Details
- Structure #
- 000000008150620
- Year Built
- 2020
- Length
- 39.6 m (129.9 ft)
- Max Span
- 13.7 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 130
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $10,656,000
- Total Project Cost
- $15,984,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.