BEDGOOD ROAD over I-75
0.5 MI N OF ARABI · County 081, Georgia · Built 1960 · 2 Lanes · 60 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
31.851442, -83.7182
This bridge is in worse condition than 36% of bridges in County 081. The average bridge in Georgia is 0 years old; this one is 66 years old.
Nearby Bridges
BEDGOOD ROAD over LIME CREEK
Built 1972
I-75 over LIME CREEK TRIB.
Built 1960
HAWPOND ROAD over I-75
Built 1960
HAWPOND ROAD over LIME CREEK
Built 1999
AMBOY ROAD over LIME CREEK
Built 2010
MUSSELWHITE ROAD over I-75 MP 94.51
Built 1960
BROCK ROAD over REEDY CREEK
Built 2020
SR 33 over N BRANCH SWIFT CREEK
Built 1932
ROCK-WENONA HOUSE over I-75 96.78N
Built 1960
HAWPOND ROAD over REEDY CREEK
Built 2009
Bridge Details
- Structure #
- 000000008100160
- Year Built
- 1960
- Length
- 57.9 m (190 ft)
- Max Span
- 18 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 60
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $742,000
- Total Project Cost
- $1,114,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.