MUSSELWHITE ROAD over I-75 MP 94.51

2 MI N OF ARABI · County 081, Georgia · Built 1960 · 2 Lanes · 20 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000008100170
Year Built
1960
Length
88.7 m (291 ft)
Max Span
30.2 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
20
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,137,000
Total Project Cost
$1,705,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.