US 17 / SR 25 over ELBOW CREEK

3 MILES SW OF RICHMOND HI · County 029, Georgia · Built 1953 · 4 Lanes · 27,900 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000002900030
Year Built
1953
Reconstructed
1984
Length
7.9 m (25.9 ft)
Max Span
2.4 m
Lanes
4
Daily Traffic
27,900
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$157,000
Total Project Cost
$235,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.