I-95 over CSX RAILROAD (635042S)

2.2 MI SW OF RICHMOND HI · County 029, Georgia · Built 1973 · 6 Lanes · 65,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002900370
Year Built
1973
Reconstructed
2001
Length
59.1 m (193.9 ft)
Max Span
20.7 m
Width
52.7 m (172.9 ft)
Lanes
6
Daily Traffic
65,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,585,000
Total Project Cost
$2,377,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.