HARRIS TRAIL over STERLING CREEK

1.8 MILES SOUTH OF RICHMO · County 029, Georgia · Built 1976 · 2 Lanes · 5,970 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000002950110
Year Built
1976
Reconstructed
2007
Length
30.5 m (100.1 ft)
Max Span
6.1 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
5,970
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$391,000
Total Project Cost
$586,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.