I-95 SBL over ELBOW SWAMP

2.5 MI S OF RICHMOND HILL · County 029, Georgia · Built 1973 · 3 Lanes · 61,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002900360
Year Built
1973
Reconstructed
2001
Length
57.9 m (190 ft)
Max Span
11.6 m
Width
24.1 m (79.1 ft)
Lanes
3
Daily Traffic
61,100
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$945,000
Total Project Cost
$1,417,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.