I-95 over SR 144

2.1 MILES NW RICHMOND HIL · County 029, Georgia · Built 1969 · 6 Lanes · 93,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002900430
Year Built
1969
Reconstructed
1996
Length
44.5 m (146 ft)
Max Span
23.5 m
Width
50.4 m (165.4 ft)
Lanes
6
Daily Traffic
93,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,193,000
Total Project Cost
$1,789,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.