I-95 over OGEECHEE RIVER OVERFLOW

11 MI SW OF SAVANNAH · County 051, Georgia · Built 1970 · 6 Lanes · 93,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005101020
Year Built
1970
Reconstructed
1994
Length
97.5 m (319.9 ft)
Max Span
12.2 m
Width
42.5 m (139.4 ft)
Lanes
6
Daily Traffic
93,400
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,614,000
Total Project Cost
$3,921,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.