I-95 over OGEECHEE RIVER OVERFLOW

2.5 MILES NORTH OF RICHMO · County 029, Georgia · Built 1969 · 6 Lanes · 93,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002900450
Year Built
1969
Reconstructed
1995
Length
85.3 m (279.9 ft)
Max Span
12.2 m
Width
50.2 m (164.7 ft)
Lanes
6
Daily Traffic
93,400
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,287,000
Total Project Cost
$3,431,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.