I-75 Express Lanes over C-9 (Snake Creek) Canal

0.5 mi N of Tpke Intchg · County 011, Florida · Built 2018 · 7 Lanes · 51,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
860678
Year Built
2018
Length
58.2 m (190.9 ft)
Max Span
19.4 m
Width
39.1 m (128.3 ft)
Lanes
7
Daily Traffic
51,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.