Ramp H4-H12 SB over I-75 SB
1 mi S of Miramar Pkwy · County 011, Florida · Built 2018 · 1 Lanes · 24,500 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
25.960417, -80.352167
This bridge is in worse condition than 8.9% of bridges in County 011. The average bridge in Florida is 0 years old; this one is 8 years old.
Nearby Bridges
BASS CREEK ROAD over I-75 (SR-93)
Built 1982
I-75SB Ramp H-12 over SNAKE CREEK (C-9) CANAL
Built 2018
I-75 Express Lanes over C-9 (Snake Creek) Canal
Built 2018
I-75 (SR-93) SB over Snake Creek
Built 1982
I-75 (SR-93) NB over Snake Creek
Built 1982
SR821 RMP to I75SB over I-75/I-75 Express Lanes
Built 2018
NB SR 93 / I-75 over SR 821 (FL Turnpike)
Built 2017
BASS CK MAINT RD over DRAINAGE CANAL
Built 1974
I-75 Rmp (SB) 39.2 over I-75 SB/Turnpike HEFT SB
Built 2017
I-75 Exp NB 39.2 over I-75 SB/Turnpike HEFT SB
Built 2017
Bridge Details
- Structure #
- 860680
- Year Built
- 2018
- Length
- 192.8 m (632.5 ft)
- Max Span
- 69.8 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 1
- Daily Traffic
- 24,500
- Material
- Steel Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.