BASS CREEK ROAD over I-75 (SR-93)
0.8 MI N of SNAKE CREEK · County 011, Florida · Built 1982 · 2 Lanes · 2,300 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
25.957006, -80.351378
This bridge is in worse condition than 70.1% of bridges in County 011. The average bridge in Florida is 0 years old; this one is 44 years old.
Nearby Bridges
I-75 (SR-93) NB over Snake Creek
Built 1982
I-75 Express Lanes over C-9 (Snake Creek) Canal
Built 2018
I-75 (SR-93) SB over Snake Creek
Built 1982
I-75SB Ramp H-12 over SNAKE CREEK (C-9) CANAL
Built 2018
Ramp H4-H12 SB over I-75 SB
Built 2018
SR821 RMP to I75SB over I-75/I-75 Express Lanes
Built 2018
NB SR 93 / I-75 over SR 821 (FL Turnpike)
Built 2017
I-75 Rmp (SB) 39.2 over I-75 SB/Turnpike HEFT SB
Built 2017
I-75 Exp NB 39.2 over I-75 SB/Turnpike HEFT SB
Built 2017
SR821 RMPTO I-75NB over SR-821/I-75
Built 1984
Bridge Details
- Structure #
- 860320
- Year Built
- 1982
- Length
- 116.7 m (382.9 ft)
- Max Span
- 33.8 m
- Width
- 14.2 m (46.6 ft)
- Lanes
- 2
- Daily Traffic
- 2,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.