I-75 (SR-93) SB over Snake Creek

1.5 mi S of Miramar Pkwy · County 011, Florida · Built 1982 · 5 Lanes · 98,323 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
860327
Year Built
1982
Length
58.5 m (191.9 ft)
Max Span
19.5 m
Width
25.2 m (82.7 ft)
Lanes
5
Daily Traffic
98,323
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.