SR821 RMPTO I-75NB over SR-821/I-75
0.5MI S BROWARD CO.LINE · County 086, Florida · Built 1984 · 2 Lanes · 16,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
25.949147, -80.351028
This bridge is in worse condition than 70% of bridges in County 086. The average bridge in Florida is 0 years old; this one is 42 years old.
Nearby Bridges
I-75 NB over SR-821
Built 1983
I-75 Express Lanes over SR 821 FLTurnpike
Built 2016
I-75 Exp NB 39.2 over I-75 SB/Turnpike HEFT SB
Built 2017
I-75 SB over SR-821
Built 1984
I-75 Rmp (SB) 39.2 over I-75 SB/Turnpike HEFT SB
Built 2017
I-75 SB Ramp over SR 821
Built 2017
NB SR 93 / I-75 over SR 821 (FL Turnpike)
Built 2017
I-75 NB over Ramp
Built 2017
SR821 RMP to I75SB over I-75/I-75 Express Lanes
Built 2018
NW186 ST(SR860) WB over I-75
Built 1985
Bridge Details
- Structure #
- 870602
- Year Built
- 1984
- Length
- 644.9 m (2115.8 ft)
- Max Span
- 67.8 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 16,500
- Material
- Prestressed Concrete Continuous
- Design
- Segmental Box Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,000,000
- Total Project Cost
- $2,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.