I-75 SB over SR-821

0.5MI S OF BROWARD CO LN · County 086, Florida · Built 1984 · 5 Lanes · 74,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
870597
Year Built
1984
Reconstructed
2017
Length
102.4 m (336 ft)
Max Span
35.2 m
Width
25.3 m (83 ft)
Lanes
5
Daily Traffic
74,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.