I-75 NB over SALT MARSH

2.5MI. SOUTH OF US-301 · County 081, Florida · Built 1980 · 3 Lanes · 60,250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
130102
Year Built
1980
Reconstructed
2023
Length
478.5 m (1569.9 ft)
Max Span
18.4 m
Width
21.8 m (71.5 ft)
Lanes
3
Daily Traffic
60,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.