I-75 SB over SALT MARSH

2.5MI SOUTH OF US-301 · County 081, Florida · Built 1980 · 3 Lanes · 120,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
130101
Year Built
1980
Reconstructed
2024
Length
347.5 m (1140.1 ft)
Max Span
18.3 m
Width
21.5 m (70.5 ft)
Lanes
3
Daily Traffic
120,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.