I-75 SB RAMP D2 over SR-64

3.0 MI S/O MANATEE RIVER · County 081, Florida · Built 2019 · 1 Lanes · 6,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
130162
Year Built
2019
Length
92.6 m (303.8 ft)
Max Span
46.3 m
Width
9.1 m (29.9 ft)
Lanes
1
Daily Traffic
6,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.