I-75 SB (SR-93) over US-301/MANATEE RIVER

3.5 MI NORTH OF SR-64 · County 081, Florida · Built 1980 · 3 Lanes · 60,250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
130103
Year Built
1980
Length
1165.8 m (3824.8 ft)
Max Span
33.5 m
Width
17.8 m (58.4 ft)
Lanes
3
Daily Traffic
60,250
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.