I-75 GEN USE LANES over MANATEE RIVER

OVER MANATEE RIVER · County 081, Florida · Built 2024 · 2 Lanes · 13,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
130157
Year Built
2024
Length
1033.6 m (3391.1 ft)
Max Span
48.6 m
Width
17.9 m (58.7 ft)
Lanes
2
Daily Traffic
13,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.