SOUTHWEST FREEWAY over 4TH STREET S.W.
SOUTHWEST FRWY & 4TH · County 001, District of Columbia · Built 1959 · 11 Lanes · 173,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
38.882322, -77.017556
This bridge is in worse condition than 34.5% of bridges in County 001. The average bridge in District of Columbia is 0 years old; this one is 67 years old.
Nearby Bridges
7TH STREET over SW FREEWAY I395
Built 1961
RAMP C I695 EAST over Ramp from Mall Tunnel
Built 1960
EASTERN AVENUE NE over CSX RAILROAD N.E.
Built 1937
SOUTHWEST FREEWAY over HALF ST TO 2ND ST SW
Built 1963
RAMP 1 over SB EXIT RMP 3 TO SB I-95
Built 1972
9TH ST. RAMP C-1 over RAMP A I-395
Built 1961
9TH STREET RAMP M over RAMPS A+C I-395
Built 1961
9TH ST BRIDGE over I-395
Built 1961
SOUTHWEST FREEWAY over HALF ST TO 2ND ST SW
Built 1963
SOUTHWEST FREEWAY over HALF ST TO 2ND ST SW
Built 1963
Bridge Details
- Structure #
- 1100
- Year Built
- 1959
- Reconstructed
- 1991
- Length
- 22.9 m (75.1 ft)
- Max Span
- 21.9 m
- Width
- 47.3 m (155.2 ft)
- Lanes
- 11
- Daily Traffic
- 173,000
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,250,000
- Total Project Cost
- $1,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.