9TH ST BRIDGE over I-395

9TH ST SW OVER I-395 · County 001, District of Columbia · Built 1961 · 2 Lanes · 5,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1107
Year Built
1961
Reconstructed
2009
Length
87.8 m (288.1 ft)
Max Span
25.9 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
5,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,150,000
Total Project Cost
$3,250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.