9TH STREET RAMP M over RAMPS A+C I-395
9TH ST SW OVER I-395 · County 001, District of Columbia · Built 1961 · 2 Lanes · 11,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
38.882344, -77.023992
This bridge is in worse condition than 34.5% of bridges in County 001. The average bridge in District of Columbia is 0 years old; this one is 65 years old.
Nearby Bridges
9TH ST BRIDGE over I-395
Built 1961
9TH ST. RAMP C-1 over RAMP A I-395
Built 1961
7TH STREET over SW FREEWAY I395
Built 1961
10th Street N.W. over S.W. FREEWAY I-95
Built 1961
D STREET S.W. over 9TH ST EXPWAY
Built 1970
RAMP E TO 12TH ST over MAINE AVE & SW FRWY
Built 1961
LEnfant Promenade over D STREET S.W.
Built 1961
12th Street over CSXT RR & D Street
Built 1964
LEnfant Plaza over RAILROAD
Built 1961
SOUTHWEST FREEWAY over WASH CHANNEL & MAINE
Built 1961
Bridge Details
- Structure #
- 1107(RAMP M)
- Year Built
- 1961
- Length
- 112.8 m (370.1 ft)
- Max Span
- 28 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 11,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $850,000
- Total Project Cost
- $1,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.