RAMP 1 over SB EXIT RMP 3 TO SB I-95
CENTER LEG INNER LOOP · County 001, District of Columbia · Built 1972 · 1 Lanes · 9,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
38.886003, -77.01325
This bridge is in worse condition than 77% of bridges in County 001. The average bridge in District of Columbia is 0 years old; this one is 54 years old.
Nearby Bridges
SOUTHWEST FREEWAY over HALF ST TO 2ND ST SW
Built 1963
SOUTHWEST FREEWAY over HALF ST TO 2ND ST SW
Built 1963
EASTERN AVENUE NE over CSX RAILROAD N.E.
Built 1937
RAMP C I695 EAST over Ramp from Mall Tunnel
Built 1960
SOUTHWEST FREEWAY over HALF ST TO 2ND ST SW
Built 1963
SOUTHWEST FREEWAY over HALF ST TO 2ND ST SW
Built 1963
Ramps E & F over PEDESTRIAN UNDERPASS
Built 1964
SOUTHWEST FREEWAY over 4TH STREET S.W.
Built 1959
SOUTHWEST FREEWAY over SOUTH CAPITOL STREET
Built 1963
SOUTHWEST FREEWAY over SOUTH CAPITOL STREET
Built 1964
Bridge Details
- Structure #
- 1142(RAMP 1)
- Year Built
- 1972
- Length
- 21.9 m (71.9 ft)
- Max Span
- 20.7 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 1
- Daily Traffic
- 9,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $150,000
- Total Project Cost
- $175,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.