SOUTHWEST FREEWAY over HALF ST TO 2ND ST SW

SOUTHWEST FRWY &2ND S · County 001, District of Columbia · Built 1963 · 1 Lanes · 12,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
1103(RAMP F)
Year Built
1963
Reconstructed
1991
Length
43.3 m (142.1 ft)
Max Span
21.3 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
12,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.