SOUTHWEST FREEWAY over HALF ST TO 2ND ST SW

SOUTHWEST FRWY &2ND S · County 001, District of Columbia · Built 1963 · 7 Lanes · 252,820 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
1103
Year Built
1963
Reconstructed
1991
Length
240.5 m (789 ft)
Max Span
33.5 m
Width
29.4 m (96.5 ft)
Lanes
7
Daily Traffic
252,820
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.