ROUTE 8 SOUTHBOUND over ROUTE 130 EAST BOUND

0.6 MI N OF I-95 · County 001, Connecticut · Built 1968 · 3 Lanes · 45,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
03539B
Year Built
1968
Reconstructed
1995
Length
22.9 m (75.1 ft)
Max Span
22.3 m
Width
16 m (52.5 ft)
Lanes
3
Daily Traffic
45,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.