ROUTE 8 NORTHBOUND over ROUTE 130 EAST BOUND

0.6 MI N OF I-95 · County 001, Connecticut · Built 1968 · 3 Lanes · 47,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
03539A
Year Built
1968
Length
24.2 m (79.4 ft)
Max Span
22.8 m
Width
16 m (52.5 ft)
Lanes
3
Daily Traffic
47,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.