ROUTE 8 NB RAMP 12 over ROUTE 8 NB RAMP 127

ROUTE 8 NB EXIT 2 · County 001, Connecticut · Built 1968 · 1 Lanes · 6,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
03543
Year Built
1968
Length
30.2 m (99.1 ft)
Max Span
27.4 m
Width
8.4 m (27.6 ft)
Lanes
1
Daily Traffic
6,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.