144TH AVE over WEST FRONTAGE RD
0.10 MI W OF I-25 · County 001, Colorado · Built 2006 · 6 Lanes · 26,804 vehicles/day
Overall
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
39.9576, -104.990194
This bridge is in worse condition than 22.8% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 20 years old.
Nearby Bridges
144TH AVENUE over I-25 ML
Built 2007
144TH AVE over EAST FRONTAGE RD
Built 2006
ORCHARD PARKWAY over LOCAL DRAINAGE
Built 2015
GRANT STREET over LOCAL DRAINAGE
Built 2018
WASHINGTON STREET over LOCAL DRAINAGE
Built 2018
WASHINGTON STREET over LOCAL DRAINAGE
Built 2010
HURON ST over SHAY DITCH
Built 2006
WASHINGTON ST over BIG DRY CREEK
Built 1993
144TH AVE over BIG DRY CREEK
Built 2021
136TH AVENUE over I-25 ML
Built 2004
Bridge Details
- Structure #
- WST25-02-X
- Year Built
- 2006
- Length
- 14.7 m (48.2 ft)
- Max Span
- 14.7 m
- Width
- 53.6 m (175.9 ft)
- Lanes
- 6
- Daily Traffic
- 26,804
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.