144TH AVE over EAST FRONTAGE RD
0.1 MI E OF I-25 · County 001, Colorado · Built 2006 · 6 Lanes · 23,906 vehicles/day
Overall
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.957683, -104.986064
This bridge is in worse condition than 22.8% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 20 years old.
Nearby Bridges
144TH AVENUE over I-25 ML
Built 2007
144TH AVE over WEST FRONTAGE RD
Built 2006
ORCHARD PARKWAY over LOCAL DRAINAGE
Built 2015
WASHINGTON STREET over LOCAL DRAINAGE
Built 2018
GRANT STREET over LOCAL DRAINAGE
Built 2018
WASHINGTON STREET over LOCAL DRAINAGE
Built 2010
144TH AVE over BIG DRY CREEK
Built 2021
WASHINGTON ST over BIG DRY CREEK
Built 1993
HURON ST over SHAY DITCH
Built 2006
FRANKLIN ST over LAKE ERIE TRIB
Built 2005
Bridge Details
- Structure #
- THN-144WAS-EFR
- Year Built
- 2006
- Length
- 15.9 m (52.2 ft)
- Max Span
- 14.7 m
- Width
- 53.8 m (176.5 ft)
- Lanes
- 6
- Daily Traffic
- 23,906
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.