144TH AVE over BIG DRY CREEK

0.4 MI E OF WASHINGTON ST · County 001, Colorado · Built 2021 · 4 Lanes · 12,054 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
THN-144WAS-BDC1
Year Built
2021
Length
25.3 m (83 ft)
Max Span
6.1 m
Width
24.4 m (80.1 ft)
Lanes
4
Daily Traffic
12,054
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.