144TH AVENUE over I-25 ML
144TH AVE OVER I25 · County 001, Colorado · Built 2007 · 8 Lanes · 25,355 vehicles/day
Overall
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
39.957567, -104.988025
This bridge is in worse condition than 22.8% of bridges in County 001. The average bridge in Colorado is 0 years old; this one is 19 years old.
Nearby Bridges
144TH AVE over EAST FRONTAGE RD
Built 2006
144TH AVE over WEST FRONTAGE RD
Built 2006
ORCHARD PARKWAY over LOCAL DRAINAGE
Built 2015
GRANT STREET over LOCAL DRAINAGE
Built 2018
WASHINGTON STREET over LOCAL DRAINAGE
Built 2018
WASHINGTON STREET over LOCAL DRAINAGE
Built 2010
HURON ST over SHAY DITCH
Built 2006
144TH AVE over BIG DRY CREEK
Built 2021
WASHINGTON ST over BIG DRY CREEK
Built 1993
136TH AVENUE over I-25 ML
Built 2004
Bridge Details
- Structure #
- THN-144WAS-I25
- Year Built
- 2007
- Length
- 82.6 m (271 ft)
- Max Span
- 39.8 m
- Width
- 40.7 m (133.5 ft)
- Lanes
- 8
- Daily Traffic
- 25,355
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.